All ¾«¶«Ó°ÊÓ articles – Page 2
-
¾«¶«Ó°ÊÓ
Profit rebounds at Bowmer & Kirkland
B&K says focus remains on strengthening balance sheet to give confidence to clients
-
¾«¶«Ó°ÊÓ
Revised designs for 500 homes on Elephant and Castle site sent in to planners
Proposed BTR scheme to include a cultural venue and student accommodation as part of the final phase of the £1.5 billion redevelopment.
-
¾«¶«Ó°ÊÓ
London council unanimously rejects plans for 29-storey Battersea tower
Height of Farrells-designed scheme branded ‘excessive and harmful’
-
¾«¶«Ó°ÊÓ
Nottingham student housing job gets green light after height cut back
Block trimmed to 10 storeys after original plan proposed 17 floors
-
¾«¶«Ó°ÊÓ
Mace brings in former ISG leader to head up Europe life sciences business
Gary Sweeney joins from interim role at T&T
-
-
¾«¶«Ó°ÊÓ
Peabody and Mount Anvil get green light for final phase of 1,300-home scheme in west London
Approval follows tussle with Ealing council over affordable contribution
-
¾«¶«Ó°ÊÓ
Planning application for Oxford Circus tower revamp to be submitted this autumn
CGI view of the proposed 33 Cavendish Square scheme behind Oxford Circus CGI view of the proposed 33 Cavendish Square scheme behind Oxford Circus
-
¾«¶«Ó°ÊÓ
BSR boss blames lack of design expertise for gateway 2 delays as he admits ‘underestimating’ challenge of new regime for industry
Around 75% of gateway 2 applications for higher risk buildings are still being turned back by the BSR
-
¾«¶«Ó°ÊÓ
Bovis moves operations director role up to board level
Company veteran Mark Ainsworth handed new post
-
¾«¶«Ó°ÊÓ
Dozens of jobs to go as Severfield pares back costs
Steelwork contractor expecting to reduce employee numbers by over 100
-
¾«¶«Ó°ÊÓ
Recovery under way at McAlpine as firm returns to black and income tops £900m
Firm had plunged to £100m-plus loss in 2023 but posts £10m profit in latest set of numbers
-
¾«¶«Ó°ÊÓ
Malaysian conglomerate formally inks deal to take 50% stake in JRL
Pair put pen to paper after beginning discussions last summer
-
¾«¶«Ó°ÊÓ
Amendments to planning bill will slash a year off infrastructure projects, government says
Deputy prime minister adds too much time wasted by ‘tiresome requirements and uncertainty’
-
¾«¶«Ó°ÊÓ
Related Argent chair stepping down
David Partridge leaving after first joining company in 1990
-
¾«¶«Ó°ÊÓ
KPF unveils plans for transformation of Oxford Circus tower
Retrofit and extension of 33 Cavendish Square being drawn up for Berkeley Estate Asset ManagementÂ
-
¾«¶«Ó°ÊÓ
Great British Nuclear puts out £600m tender for engineers to advise on mini-reactors
Successful tender expected to be picked next March
-
¾«¶«Ó°ÊÓ
Wates brings in Homes England boss to beef up public sector arm
New arrival also worked at Balfour Beatty and Laing O’Rourke
-
¾«¶«Ó°ÊÓ
Local firm brought in for fit out of £30m Bristol office built by Kier
The new building has been designed by Buckley Gray Yeoman
-
¾«¶«Ó°ÊÓ
City of London to appoint architect to design firearms training facility for Square Mile police
Winner for scheme that will be located at Dagenham Dock to be appointed this summer