All Energy, Infrastructure and Refurbishment articles – Page 53
-
¾«¶«Ó°ÊÓ
Crown Estate sets 2030 net zero target
Firm commits to being climate positive by end of decade
-
¾«¶«Ó°ÊÓ
Farringdon Crossrail station eyes spring handover
Scheme built by team featuring Kier and Bam Nuttall
-
¾«¶«Ó°ÊÓ
Probe into costs of major transport jobs launched by MPs
Written evidence due back by 15 January
-
¾«¶«Ó°ÊÓ
PM warned on lack of joined-up thinking after latest climate pledge
Boris Johnson wants emissions cut a further 15% by end of decade
-
¾«¶«Ó°ÊÓ
Former Heathrow boss drafted in to hospital building programme
Ministers want 40 schemes built by 2030
-
¾«¶«Ó°ÊÓ
Government’s green homes initiative feels MPs’ ire
Ministers told about public’s difficulties accessing initiative
-
¾«¶«Ó°ÊÓ
Watch: HS2’s demolition of Seifert’s Euston towers reach ground level
Main station contractor Mace Dragados completing final work on 1970s buildings
-
¾«¶«Ó°ÊÓ
Critical Crossrail staff kept apart to ensure late-running job not hit with covid delays
Measures put in place to make sure entire teams are not struck down at once with virus
-
¾«¶«Ó°ÊÓ
Consultants eyeing framework for £4bn Cambridgeshire metro
Lots to include engineering and design jobs
-
¾«¶«Ó°ÊÓ
Government’s proposals for HS2 phase two to be revealed before Christmas
Integrated Rail Plan also expected to unveil details for Northern Powerhouse Rail initiative
-
¾«¶«Ó°ÊÓ
Crossrail gets £825m bailout as bill for railway hits £18.6bn
Work on scheme is due to finish in 2022
-
¾«¶«Ó°ÊÓ
Government’s chief construction advisor blames dithering ministers for mega-project delays
Comments come as IPA boss said he told Highways England to rethink timetable for £8bn Lower Thames Crossing
-
¾«¶«Ó°ÊÓ
UKGBC unveils new net zero guidance
Publication is part of the UKBC’s programme to drive the transition to net zero construction
-
¾«¶«Ó°ÊÓ
Crossrail at risk of further delays, Jacobs warns
Crossrail has said spending delays have not slowdowned the programme
-
¾«¶«Ó°ÊÓ
Consultants eyeing net zero job for Scottish university
Strathclyde looking to revamp estate to meet green targets
-
¾«¶«Ó°ÊÓ
Builders’ merchant sales soar in third quarter
Overall sales up 8.3% in September compared to same month last year
-
¾«¶«Ó°ÊÓ
Crossrail racing to get Bond Street ready for next phase of testing
Railway’s boss says ‘considerable amount of work’ still required at station
-
¾«¶«Ó°ÊÓ
Wates launches carbon-cutting retrofit service
Initiative being run with specialist firm Energy Specifics
-
¾«¶«Ó°ÊÓ
Construction gives cautious thumbs-up to chancellor’s plans
Series of spending pledges made by Rishi Sunak earlier today
-
¾«¶«Ó°ÊÓ
In depth: What the National Infrastructure Strategy means for construction
Document published alongside chancellor’s Spending Review