All the latest updates on building safety reformRegulations latest
- Focus
All the latest updates on building safety reform
Typical health and fitness club sizes | |
Type of club | Development size (m2) |
Hotel health and fitness centre | 450-800 |
Independent town centre health club | 500-1400 |
Town centre health and fitness club | 950-2500 |
Out-of-town health and fitness club | 3200-4200 |
Out-of-town health, fitness and racquet club | up to 9500 |
Indicative annual energy consumption | |||
¾«¶«Ó°ÊÓ type | Energy conumption (kWh/m2 per annum) | ||
fgsa | Good | Average | Poor |
Air-conditionied office | <225 | 225-360 | >360 |
Dry sports hall | <200 | 200-340 | >340 |
Sports facility including pool | <570 | 570-840 | >840 |
Swimming pool | <1050 | 1050-1390 | >1390 |
Source: Sports Council |
Environmental services design criteria | |||
Functional area | Internal design temperature (°C) | Ventilation rate (air changes/hr) | Lighting level (lux) |
Gym | 20 | 08-Dec | 300 |
Dance Studio | 22 | 08-Dec | 300 |
Training pool | 27 | 20 | 200 |
Leisure pool | 32 | 20 | 200 |
Changing area | 22 | 20 | 150 |
WCs | 18 | 6 | 150 |
Treatment rooms | 21 | 6 | 300 |
Source : CIBSE |
Indicative costs: equipment | |
Equipment | Cost per item (£) |
Gym equipment | Ìý |
Resistance training (eg multigym, Nautilus) | 1500-2500 |
Cardiovascular training | Ìý |
Treadmills | 3000-6000 |
Rowing machines | 1000-3500 |
Step machines | 1500-4000 |
Bikes | 2500-5500 |
Cardio theatre (TV monitor and multichannel sound) | 15 000-20 000 |
Health and leisure equipment | Ìý |
Steam rooms | Ìý |
7-10 persons | 8000-12 000 |
15-20 persons | 13 000-20 000 |
Saunas | 2500-5000 |
Spa pool | 15 000-20 000 |
Sun beds | 8000-14 000 |
Gym equipment is typically replaced on a three- to five-year cycle. Equipment can also be leased. Estimates for equipment budgets should be prepared on the basis of an allowance of one machine per 8-10 m2 of gym floor area. |
Indicative construction costs of health and fitness centres | ||
Development type | Indicative area (m2) | Cost (£/m2 gross) |
Out-of-town health and fitness centre (including pool) | 3200-4200 | Ìý |
Shell | Ìý | 250-350 |
Fit-out | Ìý | 550-850 |
Town-centre health and fitness centre (excluding pool) | 950-2500 | Ìý |
Fit-out | Ìý | 800-1250 |
Leisure centre extension to existing hotel (including pool) | 450-800 | 1250-1750 |
Conversion of office space into fitness centre (excluding pool) | 100-200 | Ìý |
Limited services modifications | Ìý | 1200-1500 |
Extensive services modifications | Ìý | 1400-1700 |
Costs are at August 1998 price levels based on a South-east location. Preliminaries are included but gymnasium equipment, contingencies and allowances for the cost of site abnormals are excluded. Costs also exclude car prking, external works and services, professional fees, development on-coss and VAT. |
Cost breakdown | |||
Ìý | Element cost (£) | Cost /m2 gfa (£) | % of total cost |
Substructure | 312 600 | 84.49 | 8.99 |
Foundations; isolated pad foundations | Ìý | 50 nr @ | £400 |
Ground slab; 150 mm thick reinforced insitu concrete bed, hardcore; damp-proof membrane; below slab drainage; includes thickening to perimeter | Ìý | 2665 m2 @ | £65 |
Extra for forming swimming-pool tank; excavation; retaining walls, ducts, drainage, etc | Ìý | 480 m2 @ | £250 |
Frame | 239 600 | 64.76 | 6.89 |
Structural steel framing; portal frame; windbracing; allowance based on 35 kg/m2 | Ìý | 130 t @ | £1,100 |
Allowance for trimming steelwork to mezzanine and upper floor plant room areas | Ìý | 25 t @ | £1,250 |
Cold-rolled galvanised steel roof purlins; 1.6 m centres; 4.5 kg/m average weight | Ìý | 1900 m @ | £6 |
Cold-rolled galvanised steel sheeting rails; 1.6 m centres; 5 kg/m average weight | Ìý | 650 m @ | £6 |
Intumescent paint finish; one-hour fire resistance; moisture-resistant finish to pool area | Ìý | 2000 m2 @ | £25 |
Upper floors | 54 800 | 14.81 | 1.57 |
Insitu concrete composite floor slabs; power floating | Ìý | 990 m2 @ | £50 |
Extra for 7.5 kN/m2 floor loading to plant room areas | Ìý | 550 m2 @ | £5 |
Facia detail to exposed edge of mezzanine floor slab | Ìý | 50 m2 @ | £50 |
Roof | 221 100 | 59.76 | 6.36 |
Roof cladding; colour-coated galvanised steel sandwich panels; 60 mm thick urethane insulation | Ìý | 2950 m2 @ | £50 |
Extra for 7.5 kN/m2 floor loading to plant room areas | Ìý | 550 m2 @ | £5 |
Facia detail to exposed edge of mezzanine floor slab | Ìý | 50 m @ | £50 |
Stairs | 35 300 | 9.54 | 1.01 |
Steel feature stair and half landing; overall rise 3.50 m; polyester powder-coated mild steel balusters; stainless steel handrails; finishes | Ìý | 1 nr @ | £10 000 |
Insitu concrete stairs and half landing; overall rise 3.50 m; polyester-coated, mild steel handrails; finishes | Ìý | 2 nr @ | £4,500 |
Balustrade and handrail to mezzanine; polyester powder-coate mild steel balusters, stainless steel handrail | Ìý | 18 m @ | £350 |
Allowance for access platforms and stairs to plant rooms | Ìý | Item @ | £10 000 |
External walls | 95 500 | 25.81 | 2.75 |
Wall cladding; colour-coated galvanised steel sandwich panels; 60 mm thick urethane insulation; flashings; accessories | Ìý | 295 m2 @ | £60 |
Cavity wall; fair-faced architectural blockwork; cavity; insulation; 140 mm blockwork inner leaf; windposts etc | Ìý | 740 m2 @ | £85 |
Louvre panels; powder-coated aluminium | Ìý | 30 m2 @ | £250 |
140 mm thick blockwork backing to wall cladding; windposts | Ìý | 295 m2 @ | £25 |
Windows and external doors | 89 700 | 24.24 | 2.58 |
Aluminium-framed; thermally broken windows; sealed double-glazed units with body tinted outer pane; polyester powder coating | Ìý | 235 m2 @ | £300 |
Aluminium-framed shopfront; sealed double-glazed units with body-tinted outer pane; polyester powder coating; 2 nr entrance door sets; ironmongery | Ìý | 20 m2 @ | £600 |
Aluminium double doors and frames; powder-coated; vision panels; ironmongery | Ìý | 6 nr @ | £1,200 |
Internal walls and partitions | 151 100 | 40.84 | 4.35 |
Blockwork partitions; 140 mm average thickness | Ìý | 1500 m2 @ | £22 |
Metal stud partitions; two layers wall board each side; insulation | Ìý | 720 m2 @ | £35 |
Aluminium framed glazed partition; single-glazed units with toughened safety glass; manifestation marking | Ìý | 265 m2 @ | £280 |
Extra for sealed double-glazed units to pool area | Ìý | 165 m2 @ | £50 |
Toilet cubicle partitions | Ìý | 13 nr @ | £650 |
Melamine-faced solid laminate access ducting | Ìý | 20 m @ | £100 |
Internal doors | 71 500 | 19.32 | 2.06 |
Flush doors; fire-rated; solid core laminate/veneer-faced; hardwood frames; decorations; ironmongery; complete | Ìý | 60 nr @ | £750 |
Flush doors; non-fire-rated; solid-core laminate/veneer-faced; hardwood frames; decorations; irnomongery; complete | Ìý | 30 nr @ | £650 |
Extra over aluminium-framed glazed partitions for doors and frames; ironmongery; complete | Ìý | 7 nr @ | £1,000 |
Wall finishes | 68 300 | 18.46 | 1.96 |
Ceramic tiles; to blockwork or plasterboard | Ìý | 700 m2 @ | £45 |
Extra for sand cement backing to ceramic tiles; to blockwork | Ìý | 535 m2 @ | £8 |
13 mm two-coat lightweight plaster; two coats emulsion paint; to blockwork | Ìý | 1960 m2 @ | £10 |
Two coats emulsion paint; to blockwork | Ìý | 1130 m2 @ | £3 |
Extra for water resistant paint finish to pool hall | Ìý | 250 m2 @ | £2 |
Skim coat and two coats emulsion paint to plasterboard | Ìý | 410 m2 @ | £5 |
Waterproof render and mosaic tiles to pool tank sides | Ìý | 100 m2 @ | £70 |
Floor finishes | 190 300 | 51.43 | 5.47 |
Sand cement screed; average 50 mm thick | Ìý | 2700 m2 @ | £8 |
Heavy-duty carpet tiles | Ìý | 1900 m2 @ | £35 |
Painted hardwood skirting | Ìý | 700 m @ | £10 |
Timber strip flooring; to reception and bar etc; including skirtings | Ìý | 190 m2 @ | £55 |
Semi-sprung beech strip flooring to aerobics room; including skirtings | Ìý | 100 m2 @ | £65 |
Ceramic tiles to dry changing areas; including ceramic coved skirting | Ìý | 150 m2 @ | £50 |
Non-slip ceramic tiles to wet changing areas and pool surround; including ceramic coved skirting | Ìý | 320 m2 @ | £65 |
Extra for edge tile and grating to pool perimeter | Ìý | 75 m @ | £110 |
Allowance for drainage gullies and gratings to wet change areas | Ìý | Item @ | £2,000 |
Waterproof render and mosaic tiles to pool tank base; including lane markings etc | Ìý | 310 m2 @ | £75 |
Granolithic to plant rooms; skirting | Ìý | 510 m2 @ | £25 |
Mats and matwells | Ìý | Item @ | £5,000 |
Ceiling finishes | 69 500 | 18.78 | 2 |
Acoustic sof lining to pool and gym | Ìý | 1750 m2 @ | £20 |
Suspended ceilings; mineral-fibre tiles; lay in grid; generally | Ìý | 1270 m2 @ | £25 |
Extra over suspended ceilings for moisture-resistant tiles to changing areas | Ìý | 440 m2 @ | £5 |
Extra over suspended ceilings for acoustic tiles to aerobic room | Ìý | 100 m2 @ | £5 |
Furniture and fittings | 289 600 | 78.27 | 8.33 |
(Excluding allowances for gymnasium equipment, loose furniture, catering equipment, loose office furniture, fittings and equipment, music and TV installations) | Ìý | Ìý | Ìý |
Reception desk; turnstile entry control | Ìý | Item @ | £18 000 |
Bar counter and back bar units; roller grilles | Ìý | Item @ | £25 000 |
Vanitory units; mirrors; fittings etc to changing areas | Ìý | Item @ | £20 000 |
Benches to changing areas | Ìý | Item @ | £5,000 |
Lockers | Ìý | 400 nr @ | £200 |
Composite safety mirrors to exercise areas | Ìý | 150 m2 @ | £220 |
Ballet barre; to aerobics studio | Ìý | 12 m @ | £300 |
Allowance for signage, banners, graphics etc to exercise, pool and circulation areas | Ìý | Item @ | £50 000 |
Allowance for supervisor's workstations; noticboards etc, to exercise areas | Ìý | Item @ | £10 000 |
Allowance for fittings to creche | Ìý | Item @ | £10 000 |
Allowance for fixed furniture, noticeboards etc to office areas | Ìý | Item @ | £10 000 |
Allowance for fittings to pool; steps; pool cover; skimmers; pacer clocks etc | Ìý | Item @ | £20 000 |
Allowance for internal planting | Ìý | Item @ | £5,000 |
Sanitary fittings | 36 400 | 9.84 | 1.05 |
WCs, urinals, washhand basins; generally | Ìý | 32 nr @ | £300 |
Extra for fittings for disabled WCs | Ìý | 2 nr @ | £100 |
Showers; cabinets, trays, fittings | Ìý | 24 nr @ | £1,000 |
Cleaners sinks | Ìý | 3 nr @ | £350 |
Drinking water fountain | Ìý | 6 nr @ | £250 |
Disposal installations | 22 000 | 5.95 | 0.63 |
Rainwater disposal; cast iron downpipes and fittings | Ìý | 3700 m2 @ | £2.50 |
Waste, soil and vent installation; uPVC pipework and fittings | Ìý | 73 nr @ | £175 |
Water installations | 34 800 | 9.41 | 1 |
Hot and cold water service; calorifiers; hot and cold water storage; distribution to WCs, changing areas, water fountains etc | Ìý | 116 nr @ | £300 |
Space heating and air treatment | 435 200 | 117.62 | 12.52 |
Gas installation | Ìý | Item @ | £10 000 |
Low-temperature hot-water heating; boiler plant serving swimming pool and space heating; flues; pumps and valves; distribution within plant rooms; insulation | Ìý | 3700 m2 @ | £20 |
Chilled water installation; chiller; pressurisation unit; pumps and valves; distribution within plant rooms; insulation and trace heating | Ìý | 3700 m2 @ | £10 |
Supply and extract ventilation to gym; air-handling unit with heating and cooling batteries; high-level, low-velocity ductwork; diffusers | Ìý | 1250 m2 @ | £65 |
Supply and extract ventilation to pool; air-handling unit with heating battery and heat recovery; high-level, low-velocity ductwork; diffusers | Ìý | 480 m2 @ | £90 |
Supply and extract ventilation; heating and comfort cooling to cellular spaces; air-handling units with heating and cooling batteries; ductwork; insulation; grilles and diffusers | Ìý | 1270 m2 @ | £110 |
Extra for changing room and toilet extract installation; allowance for steam room extract | Ìý | Item @ | £25 000 |
Allowance for kitchen extract installation | Ìý | Item @ | £15 000 |
Plant room ventilation; allowance for chemical extract | Ìý | Item @ | £10 000 |
Electrical installations | 245 800 | 66.43 | 7.07 |
Mains and sub-mains installation | Ìý | Item @ | £50 000 |
Small power distribution | Ìý | 3700 m2 @ | £15 |
Lighting and luminaires to fitness area | Ìý | 1250 m2 @ | £30 |
Lighting and moisture resistant luminaires to pool hall | Ìý | 480 m2 @ | £25 |
Lighting and luminaires to aerobics and ancillary spaces | Ìý | 1780 m2 @ | £35 |
Emergency lighting installation | Ìý | 3700 m2 @ | £5 |
Power to mechanical services | Ìý | Item @ | £10 000 |
Lift installations | 18 000 | 4.86 | 0.52 |
Five-person, 430 kg hydraulic lift serving 2 nr floors; 0.3 m/s | Ìý | Item @ | £18 000 |
Protective installations | 9 300 | 2.51 | 0.27 |
Lightning protection | Ìý | 3700 m2 @ | £1.50 |
Earthing and bonding | Ìý | 3700 m2 @ | £1 |
Communications installations | 127 000 | 34.32 | 3.65 |
Fire and smoke detection and alarm system | Ìý | 3700 m2 @ | £15 |
Public address system | Ìý | 3700 m2 @ | £5 |
TV installation; central aerial, wireways, points and wall mounting brackets (monitors excluded) | Ìý | Item @ | £10 000 |
Intruder detection | Ìý | 3700 m2 @ | £1.50 |
Access control | Ìý | Item @ | £5,000 |
CCTV system; 10 nr cameras | Ìý | Item @ | £25 000 |
Wireways for telephones and data | Ìý | 3700 m2 @ | £2 |
Special installations | 152 500 | 41.22 | 4.39 |
¾«¶«Ó°ÊÓ management system | Ìý | 3700 m2 @ | £15 |
Pool filtration system; chlorine based | Ìý | Item @ | £55 000 |
Steam rooms (2 nr) | Ìý | Item @ | £30 000 |
Saunas (2 nr) | Ìý | Item @ | £12 000 |
Builder's work in connection | 54 000 | 14.59 | 1.55 |
Forming holes, chases etc: allow 5% | Ìý | Item @ | £54 000 |
Preliminaries and contingencies | 453 000 | 122.43 | 13.03 |
Contractor's overheads, site establishment and site supervision, excluding design fees; allow 10% | Ìý | Item @ | £302 000 |
Contingency sum: allow 5% | Ìý | Item @ | £151 000 |
Total construction cost - building only | 3 476 900 | 939.69 | 100 |
Regional variations | |
The cost breakdown is based on a project in the South-east and should be adjusted by the following location factors for schemes in other regions. | |
Inner London | 1.1 |
Outer London | 1.04 |
South-west | 0.95 |
East Midlands | 0.93 |
West Midlands | 0.95 |
East Anglia | 0.95 |
Yorkshire and Humberside | 0.93 |
North-west | 0.98 |
North | 0.93 |
Scotland | 0.96 |
Wales | 0.94 |
Northern Ireland | 0.82 |
Alternative element specifications | |
Ìý | Net extra cost/saving £/m2 gfa |
Roof | Ìý |
Roof cladding; colour-coated galvanised profile steel sheet; mineral fibre insulation; coted liner sheet; including allowances for ridge, verges, eaves and gutters - 2950 m2 : £48 | -14.5 |
Roof cladding; standing seam aluminium with nautral finish; insulatino; vapour barrier; colour-coated liner sheet; accessories - 2950 m2 @£75 | 10.36 |
Additional cost of rooflights; polycarbonate; including forming and trimming opening; flashings etc - 150 m2 @ £250 | 11.7 |
Additional cost of rooflights; aluminium framed double glazed units; including forming and trimming opening; flashings etc - 150 m2 @ £350 | 16.39 |
External walls, windows and doors | Ìý |
Wall cladding; colour coated galvanised profiled steel sheet; mineral fibre insulation; coated liner sheet; flashings - 295 m2 @ £35 | -2.3 |
Wall cladding; colour coated aluminium composite panel; flashings - 295 m2 @ £150 | +8.29q |
Cavity walling; facing brickwork (PC sum = £300/£1000); cavity, insulation; 140 mm blockwork inner leaf; windposts etc - 740 m2 @ £80 | -1.16 |
Finishes | Ìý |
Non-sprung timber strip flooring to gymnasia; concrete sealer to floor void - 1250 m2 @ £60 | 9.76 |
Mondoramaflex flooring to gymnasia - 1250 m2 @ £68 | 12.88 |
Omission of acoustic soffit lining to pool and gym - 1750 m2 @ £25 | -13.66 |
Mechanical services installation | Ìý |
Supply and extract ventilation, heating and comfort cooling to cellualr spaces; four-pipe fan-coil installation - 1270 m2 @ £180 | 29.13 |
Site powered by